Loading articleโฆ
Loading 4weirdโฆ
Loading articleโฆ
DocsKanban
Docs ยท remastery wave 1
Visual kanban boards for every squad: drag-and-drop cards across positioned columns, deadline-bound sprint cycles, priorities, hour estimates, and assignees โ with estimates that flow straight into the time tracker.
The board
Each board belongs to a squad (and optionally a project) with an owner. Columns are positioned lists; cards carry title, description, priority, estimate_hours, due_date, labels, assignee, and position. Cycles are sprint windows with start/end dates and a 0โ100 progress percentage; cards attach to the active cycle.
sprint board โ โship the raidโ
68% doneTODO
Instanced mesh pass ๐ด 4h
DOING
Timer Web Worker ๐ 2.5h
DONE
Remastery routes test ๐ข 1h
Access
Board access is owner-or-member: the owner plus anyone on the squad roster. Card access resolves through the parent board, so there is no back door โ if you cannot see the board, you cannot see its cards.
Ritual