Loading articleโฆ
Loading 4weirdโฆ
Loading 4weirdโฆ
Loading articleโฆ
DocsKanban
Docs ยท remastery wave 1
Visual kanban boards for every squad: drag-and-drop cards across positioned columns, deadline-bound sprint cycles, priorities, hour estimates, and assignees โ with estimates that flow straight into the time tracker.
The board
Each board belongs to a squad (and optionally a project) with an owner. Columns are positioned lists; cards carry title, description, priority, estimate_hours, due_date, labels, assignee, and position. Cycles are sprint windows with start/end dates and a 0โ100 progress percentage; cards attach to the active cycle.
sprint board โ โship the raidโ
68% doneTODO
Instanced mesh pass ๐ด 4h
DOING
Timer Web Worker ๐ 2.5h
DONE
Remastery routes test ๐ข 1h
Access
Board access is owner-or-member: the owner plus anyone on the squad roster. Card access resolves through the parent board, so there is no back door โ if you cannot see the board, you cannot see its cards.
Ritual
Worked example
Follow one fictional week on the GraveGain raid squad board. Six cards, one active cycle, estimates in hours. By Friday the math tells the story without a status meeting.
cycle preview: ship the raid, week 1
54% doneDone estimates total 7.5 of 14 planned hours, so the cycle bar reads 54 percent. The doing card holds the risk: one high priority item with a named owner and a due date beats three unowned cards every time. At review the squad rolls the two todo cards into week 2 and converts the 7.5 unbilled hours toward a draft invoice. Prefer plain English? Read the kanban sprints guide, then reconcile logged hours in the time tracker.
Troubleshooting